A. The Division shall ensure that value engineering is employed for any capital project costing more than $5 million. Value engineering may also be used for any project costing $5 million or less. For purposes of this section, “value engineering” means a systematic process of review and analysis of a capital project by a team of persons not originally involved in the project. Such team, which shall include appropriate professionals licensed in accordance with Chapter 4 of Title 54.1, may offer suggestions that would improve project quality and reduce total project cost by combining or eliminating inefficient or expensive parts or steps in the original proposal or by totally redesigning the project using different technologies, materials, or methods.

Terms Used In Virginia Code 2.2-1133

  • Contract: A legal written agreement that becomes binding when signed.
  • Fiscal year: The fiscal year is the accounting period for the government. For the federal government, this begins on October 1 and ends on September 30. The fiscal year is designated by the calendar year in which it ends; for example, fiscal year 2006 begins on October 1, 2005 and ends on September 30, 2006.
  • in writing: include any representation of words, letters, symbols, numbers, or figures, whether (i) printed or inscribed on a tangible medium or (ii) stored in an electronic or other medium and retrievable in a perceivable form and whether an electronic signature authorized by Chapter 42. See Virginia Code 1-257
  • Process: includes subpoenas, the summons and complaint in a civil action, and process in statutory actions. See Virginia Code 1-237
  • State: when applied to a part of the United States, includes any of the 50 states, the District of Columbia, the Commonwealth of Puerto Rico, Guam, the Northern Mariana Islands, and the United States Virgin Islands. See Virginia Code 1-245

B. The review developed pursuant to subsection A shall be compiled in a value engineering report and submitted to the Division. Each item included in the value engineering report shall have a status designation of accepted, declined, or accepted as modified. The Division, within 45 days, must approve the value engineering report before the project may move to the next phase of design.

C. A value engineering report shall not be required for projects that (i) are designed utilizing either the design-build or construction management at risk basis and (ii) have the value engineering process as an integral component. In such cases, a written summary of the cost savings that have been incorporated into the design shall be provided to the Division prior to moving forward to the construction phase of the contract.

D. The Director of the Department may waive the requirements of this section for any proposed capital project for compelling reasons. Any waiver shall be in writing, state the reasons for the waiver, and apply only to a single capital project. On or before September 15 of each year, the Director of the Department shall report to the Governor and the General Assembly on the (i) number and value of the capital projects where value engineering was employed and (ii) identity of the capital projects for which a waiver of the requirements of this section was granted, including a statement of the compelling reasons for granting the waiver. The report shall cover projects completed or for which a waiver was granted within the previous fiscal year.

E. Notwithstanding any law to the contrary, the provisions of this section shall apply to public institutions of higher education in the Commonwealth.

1994, cc. 442, 829, § 2.1-483.1:1; 1996, c. 553; 1997, c. 230; 1998, c. 207; 2001, c. 844; 2008, c. 370; 2015, c. 572.