§ 60.480 Applicability and designation of affected facility
§ 60.481 Definitions
§ 60.482-1 Standards: General
§ 60.482-2 Standards: Pumps in light liquid service
§ 60.482-3 Standards: Compressors
§ 60.482-4 Standards: Pressure relief devices in gas/vapor service
§ 60.482-5 Standards: Sampling connection systems
§ 60.482-6 Standards: Open-ended valves or lines
§ 60.482-7 Standards: Valves in gas/vapor service and in light liquid service
§ 60.482-8 Standards: Pumps and valves in heavy liquid service, pressure relief devices in light liquid or heavy liquid service, and connectors
§ 60.482-9 Standards: Delay of repair
§ 60.482-10 Standards: Closed vent systems and control devices
§ 60.483-1 Alternative standards for valves–allowable percentage of valves leaking
§ 60.483-2 Alternative standards for valves–skip period leak detection and repair
§ 60.484 Equivalence of means of emission limitation
§ 60.485 Test methods and procedures
§ 60.486 Recordkeeping requirements
§ 60.487 Reporting requirements
§ 60.488 Reconstruction
§ 60.489 List of chemicals produced by affected facilities

Terms Used In CFR > Title 40 > Chapter I > Subchapter C > Part 60 > Subpart VV - Standards of Performance for Equipment Leaks of Voc in the Synthetic Organic Chemicals Manufacturing Industry for Which Construction, Reconstruction, or Modification Commenced After January 5, 1981, and On or Before November 7, 2006

  • Discovery: Lawyers' examination, before trial, of facts and documents in possession of the opponents to help the lawyers prepare for trial.
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.