|
|
§ 404.47 |
How will a feasibility study be conducted under this program? |
§ 404.48 |
What process will Reclamation follow to determine if a feasibility study is ready for review? |
§ 404.49 |
What criteria will Reclamation use to determine whether to recommend that a proposed rural water supply project be authorized for construction? |
§ 404.50 |
What information will be included in the feasibility report prepared by Reclamation |
§ 404.51 |
Are proposed projects under the Rural Water Supply Program reviewed by the Administration? |
§ 404.52 |
Who will the feasibility report be provided to? |