Nevada Revised Statutes 701A.343 – ‘Term of construction’ defined. [Effective through June 30, 2049.]
Current as of: 2023 | Check for updates
|
Other versions
‘Term of construction’ means the period which begins when a building permit is issued for the construction of a facility and ends:
1. When the facility goes online; or
2. At such other time as the Director may determine.
