The commission may adopt rules to regulate electric vehicle supply equipment in operation before January 1, 2024, that:
(1) has never had a metering system in place capable of measuring electricity transferred from the charging station to the vehicle; or
(2) is not capable of measuring the time elapsed while actively charging a vehicle and calculating a fee for the charging session.