Except as otherwise provided in RCW 90.03.525, any public entity and public property, including the state of Washington and state property, shall be subject to rates and charges for stormwater control facilities to the same extent private persons and private property are subject to such rates and charges that are imposed by counties pursuant to RCW 36.89.080. In setting these rates and charges, consideration may be made of in-kind services, such as stream improvements or donation of property.

NOTES:

Severability1986 c 278: See note following RCW 36.01.010.
Severability1983 c 315: See note following RCW 90.03.500.
Flood control zone districtsStormwater control improvements: Chapter 86.15 RCW.
Rates and charges for stormwater control facilitiesLimitationsDefinitions: RCW 90.03.500 through 90.03.525. See also RCW 35.67.025, 35.92.021, and 36.94.145.

Terms Used In Washington Code 36.89.085

  • stormwater control facilities: as used in this chapter mean any facility, improvement, development, property or interest therein, made, constructed or acquired for the purpose of controlling, or protecting life or property from, any storm, waste, flood or surplus waters wherever located within the county, and shall include but not be limited to the improvements and authority described in RCW 86. See Washington Code 36.89.010