(a) For purposes of this section, the term "production blasting" means blasting that removes the overburden to expose underlying coal seams and does not include construction blasting.

Terms Used In West Virginia Code 22-3-22a

  • Division: means the Division of Environmental Protection. See West Virginia Code 22-3-3
  • in writing: includes any representation of words, letters, or figures, whether by printing, engraving, writing, or otherwise. See West Virginia Code 2-2-10
  • Minerals: means clay, coal, flagstone, gravel, limestone, manganese, sand, sandstone, shale, iron ore and any other metal or metallurgical ore. See West Virginia Code 22-3-3
  • Operation: means those activities conducted by an operator who is subject to the jurisdiction of this article. See West Virginia Code 22-3-3
  • Operator: means any person who is granted or who should obtain a permit to engage in any activity covered by this article and any rule promulgated under this article and includes any person who engages in surface mining or surface mining and reclamation operations, or both. See West Virginia Code 22-3-3
  • Permit: means a permit to conduct surface mining operations pursuant to this article. See West Virginia Code 22-3-3
  • Permit area: means the area of land indicated on the approved proposal map submitted by the operator as part of the operator'. See West Virginia Code 22-3-3
  • Person: means any individual, partnership, firm, society, association, trust, corporation, other business entity or any agency, unit or instrumentality of federal, state or local government. See West Virginia Code 22-3-3
  • Underground mine: means the surface effects associated with the shaft, slopes, drifts or inclines connected with excavations penetrating coal seams or strata and the equipment connected therewith which contribute directly or indirectly to the mining, preparation or handling of coal. See West Virginia Code 22-3-3

(b) For purposes of this section, the term "construction blasting" means blasting to develop haul roads, mine access roads, coal preparation plants, drainage structures or underground coal mine sites and does not include production blasting.

(c) For purposes of this section, the term "protected structure" means any of the following structures that are situated outside the permit area: An occupied dwelling; a temporarily unoccupied dwelling which has been occupied within the past ninety days; a public building; a structure for commercial purposes; a school; a church; a community or institutional building; and a public park or a water well.

(d) Production blasting is prohibited within three hundred feet of a protected structure or within one hundred feet of a cemetery.

(e) Blasting within one thousand feet of a protected structure shall have a site-specific blast design approved by the Division of Mining and Reclamation. The site-specific blast design shall limit the type of explosives and detonating equipment, the size, the timing and frequency of blasts to do the following:

(1) Prevent injury to persons; (2) prevent damage to public and private property outside the permit area; (3) prevent adverse impacts on any underground mine; (4) prevent change in the course, channel or availability of ground or surface water outside the permit area; and (5) reduce dust outside the permit area.

In the development of a site-specific blasting plan, consideration shall be given, but is not limited to, the physical condition, type and quality of construction of the protected structure, the current use of the protected structure and the concerns of the owner or occupant living in the protected structures identified in the blasting schedule notification area.

(f) An owner or occupant of a protected structure may waive the blasting prohibition within three hundred feet. If a protected structure is occupied by a person other than the owner, both the owner and the occupant of the protected structure shall waive the blasting prohibition within three hundred feet in writing. The operator shall send copies of all written waivers executed pursuant to this subsection to the Division of Mining and Reclamation. Written waivers executed and filed with the Division of Mining and Reclamation are valid during the life of the permit or any renewals of the permit and are enforceable against any subsequent owners or occupants of the protected structure.

(g) The provisions of this section do not apply to the following: (1) Underground coal mining operations; (2) the surface operations and surface impacts incident to an underground coal mine; and (3) the extraction of minerals by underground mining methods or the surface impacts of the underground mining methods: Provided, That nothing contained in this section may be construed to exempt any coal mining operation from the general performance standards as contained in section thirteen of this article and any rules promulgated pursuant to said section.