(4) |
There is appropriated for fiscal year 1984-85 $4,050,000 from the Water Development and Flood Mitigation Reserve Account to the Division of Water Resources to use for all of the following:
(a) |
$2,000,000 for final engineering studies for west desert pumping; |
(b) |
$500,000 for implementation of the State Water Plan, including, but not limited to, engineering studies on Bear River upstream diversion and storage projects and Hatch Town Reservoir; |
(c) |
(i) |
$750,000 to prepare final design reports and cost estimates for the following:
(A) |
Option A – No. Davis WWTP, West Kaysville, Centerville, Bard, West Bountiful, So. Davis No. WWTP, Phillips, Woods Cross, Jordan River WWTP, and the Salt Lake International Airport; and |
(B) |
Option B – Antelope Island roadway dikes. |
|
(ii) |
It is the intent of the Legislature to choose between Options A and B after the final design reports are completed. The final design reports for Option B shall be completed by consultants other than those who prepared the original report. The reports for both Options A and B shall clearly indicate the following for each alternative:
(A) |
estimated construction costs; |
(B) |
estimated costs of operation and maintenance; |
(C) |
estimated time necessary for completion; |
(D) |
benefits with respect to flood control, tourism, recreation, long-term second use, and new access to Antelope Island and marsh lands; and |
(E) |
impact on roads and esthetic land features during construction. |
|
|
(d) |
$250,000 to prepare final design reports for the following projects: Corrine-WWTP, Plain City-WWTP, Perry-WWTP, and Little Mtn.-WWTP; |
(e) |
$500,000 to construct the South Shore project; and |
(f) |
$50,000 to reevaluate inter-island diking between South Shore, Antelope Island, Fremont Island, and Promontory Point. |
|