Montana Code 60-4-403. Relocation — costs
60-4-403. Relocation — costs. (1) Except as provided in subsections (2) and (3), 75% of all costs of relocation, dismantling, and removal must be paid by the department as a cost of commission-designated highway systems construction.
Terms Used In Montana Code 60-4-403
- Contract: A legal written agreement that becomes binding when signed.
- State: when applied to the different parts of the United States, includes the District of Columbia and the territories. See Montana Code 1-1-201
(2)The department shall pay for the entire cost of relocating a publicly owned water or sewer facility with 500 or fewer service connectors under the following conditions:
(a)the facility has had 500 or fewer subscribers during the entire year before the letting of the project contract; and
(b)the relocation is the result of state highway or commission-designated highway system construction.
(3)The department shall pay for 85% of all costs of relocating a publicly owned water or sewer facility with more than 500 but fewer than 1,000 service connectors, subject to the following conditions:
(a)the facility had more than 500 but fewer than 1,000 subscribers during the entire year before the letting of the project contract; and
(b)the relocation is the result of state highway or commission-designated highway system construction.