Kansas Statutes 82a-2416. Same; specific projects; review of general plan
Terms Used In Kansas Statutes 82a-2416
- Board: means the board of directors of a reservoir improvement district;
(b) "district" means a reservoir district for which organization is proposed or has been organized under the provisions of this act, and amendments thereto;
(c) "eligible water right holder" means any person:
(1) Holding a water right or permit, pursuant to Kan. See Kansas Statutes 82a-2402
- general plan: means a preliminary engineering report describing the characteristics of the reservoir, the nature and methods of dealing with the bed and water problems in the reservoir or the reservoir watershed and the projects proposed to be undertaken by the district. See Kansas Statutes 82a-2402
- State: when applied to the different parts of the United States, includes the District of Columbia and the territories. See Kansas Statutes 77-201
(a) Following the adoption of the general plan and adoption of the method of financing, the board of directors may determine the order in which specific projects contemplated by the general plan shall be undertaken. The board shall then cause accurate surveys of all work deemed necessary to be done and accurate estimates and calculations to be made by a competent engineer who shall prepare detailed construction plans and specifications showing the location, amount, and character of work to be done and the estimated cost of right of way, construction, maintenance and operation, which plans, specifications and estimates of costs shall be filed in the office of the secretary of the board and shall at all reasonable times be open to public inspection. The board shall carefully examine and consider the same and if they approve such plans, specifications and estimates of costs, they shall transmit a complete copy thereof to the director of the Kansas water office, who shall examine and study the plans and specifications as to conformance to the general plan and other applicable state laws on water use and control and transmit a written report of the results of the director’s study and investigation to the board which report shall include any changes or modifications, which the director deems necessary, and which shall include a specific approval or disapproval of the plans and specifications.
(b) Ten years following approval of the general plan and every five years thereafter, the board shall review the general plan to determine if projects proposed to be undertaken by the district in its original plan are still feasible. A report of the review shall be given at a public meeting called for that purpose. This review is not required of reservoir improvement districts that have completed all the projects in the general plans.
Any revisions or amendments to the general plan shall be submitted to the director of the Kansas water office in the manner provided by Kan. Stat. Ann. § 82a-2414, and amendments thereto.
