40 CFR 35.2114 – Value engineering
Current as of: 2024 | Check for updates
|
Other versions
(a) If the project has not received Step 2 grant assistance the applicant shall conduct value engineering if the total estimated cost of building the treatment works is more than $10 million.
(b) The value engineering recommendations shall be implemented to the maximum extent feasible.