40 CFR 98.476 – Data reporting requirements
If you are subject to this part and report under this subpart, you are not required to report the information in § 98.3(c)(4) for this subpart. In addition to the information required by § 98.3(c)(1) through § 98.3(c)(3) and by § 98.3(c)(5) through § 98.3(c)(9), you must report the information listed in this section.
(a) If you receive CO
(1) The total net mass of CO
(2) If a volumetric flow meter is used to receive CO
(i) The volumetric flow through a receiving flow meter at standard conditions (in standard cubic meters) in each quarter.
(ii) The volumetric flow through a receiving flow meter that is redelivered to another facility without being injected into your well (in standard cubic meters) in each quarter.
(iii) The CO
(3) If a mass flow meter is used to receive CO
(i) The mass flow through a receiving flow meter (in metric tons) in each quarter.
(ii) The mass flow through a receiving flow meter that is redelivered to another facility without being injected into your well (in metric tons) in each quarter.
(iii) The CO
(4) The standard or method used to calculate each value in paragraphs (a)(2) through (a)(3) of this section.
(5) The number of times in the reporting year for which substitute data procedures were used to calculate values reported in paragraphs (a)(2) through (a)(3) of this section.
(6) Whether the flow meter is mass or volumetric.
(b) If you receive CO
(1) The mass (in metric tons) or volume at standard conditions (in standard cubic meters) of contents in containers in each quarter.
(2) The concentration of CO
(3) The mass (in metric tons) or volume (in standard cubic meters) of contents in containers that is redelivered to another facility without being injected into your well in each quarter.
(4) The net total mass of CO
(5) The standard or method used to calculate each value in paragraphs (b)(1), (b)(2), and (b)(3) of this section.
(6) The number of times in the reporting year for which substitute data procedures were used to calculate values reported in paragraphs (b)(1) and (b)(2) of this section.
(c) If you use more than one receiving flow meter, report the net total mass of CO
(d) The source of the CO
(1) CO
(2) Electric generating unit.
(3) Ethanol plant.
(4) Pulp and paper mill.
(5) Natural gas processing.
(6) Gasification operations.
(7) Other anthropogenic source.
(8) Discontinued enhanced oil and gas recovery project.
(9) Unknown.
(e) Report the following:
(1) Whether the facility received a Research and Development project exemption from reporting under 40 CFR part 98, subpart RR, for this reporting year. If you received an exemption, report the start and end dates of the exemption approved by EPA.
(2) Whether the facility includes a well or group of wells where a CO
(3) Whether the facility includes a well or group of wells where a CO
(4) Whether the facility includes a well or group of wells where a CO
(5) Whether the facility includes a well or group of wells where a CO