46 CFR 162.050-1 – Scope
Current as of: 2024 | Check for updates
|
Other versions
(a) This subpart contains—
(1) Procedures for approval of 15 ppm separators, oil content meters, and bilge alarms.
(2) Design specifications for this equipment;
(3) Tests required for approval;
(4) Procedures for obtaining designation as a facility authorized to conduct approval tests;
(5) Marking requirements; and
(6) Factory inspection procedures.
(b) [Reserved]