California Water Code 138.10 – (a) On or before January 1, 2006, the director, in collaboration …
(a) On or before January 1, 2006, the director, in collaboration with the Secretary of Interior or his or her designee, shall prepare a plan to meet the existing permit and license conditions for which the department has an obligation, as described in the State Water Resources Control Board Decision No. 1641.
(b) The plan shall be designed to achieve compliance with the permit and license conditions described in subdivision (a). The director shall prepare the plan, and submit copies of the plan to the board and the California Bay-Delta Authority, prior to increasing the existing permitted diversion rate at the State Water Project’s Harvey O. Banks Pumping Plant.
Terms Used In California Water Code 138.10
- Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
- State: means the State of California, unless applied to the different parts of the United States. See California Water Code 18
- Subdivision: means a subdivision of the section in which that term occurs unless some other section is expressly mentioned. See California Water Code 10
(c) Nothing in this section limits or restricts the department in its operation of the State Water Project due to failure of other water rights permittees or licensees to meet water quality conditions of their respective permits or licenses.
(Added by Stats. 2004, Ch. 612, Sec. 1. Effective January 1, 2005.)
