Indiana Code 5-22-15-25. Steel products
Terms Used In Indiana Code 5-22-15-25
(c) Unless the head of the purchasing agency makes a written determination described in subsection (d), a solicitation must require that if any steel products are used in:
(1) the manufacture of the supplies required under the contract; or
(2) supplies used in the performance of the services under the contract by the contractor or a subcontractor of the contractor;
the steel products must be manufactured in the United States.
(d) Subsection (c) does not apply if the:
(1) head of the purchasing agency determines in writing that:
(A) the cost of the contract with the requirements of subsection (c) would be greater than one hundred fifteen percent (115%) of the cost of the contract without the requirements of subsection (c); and
(B) failure to impose the requirements of subsection (c) would not in any way:
(i) harm the business of a facility that manufactures steel products in Indiana; or
(ii) result in the reduction of employment or wages and benefits of employees of a facility described in item (i); or
(2) purchase is:
(A) less than ten thousand dollars ($10,000); and
(B) made under the small purchase policies (as described in IC 5-22-8-2(b)) established by the purchasing agency or under rules adopted by the governmental body.
(e) A purchasing agency shall inform offerors in the solicitation of the provisions of this section.
As added by P.L.194-2001, SEC.2.
