(1) Before commencing the reconstruction or alteration of a dam or the abandonment, breach, or removal of a dam so that it no longer constitutes a dam, the owner shall file an application and secure the written application approval of the department.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Nebraska Statutes 46-1653

  • Abandonment: means the process of rendering a dam incapable of impounding by (1) dewatering and filling the reservoir created by such dam with solid materials and (2) creating a stable watercourse around the site. See Nebraska Statutes 46-1603
  • Application approval: means authorization in writing issued by the department to an owner who has applied to the department for permission to construct, reconstruct, enlarge, alter, breach, remove, or abandon a dam and which specifies the conditions or limitations under which work is to be performed by the owner or under which approval is granted. See Nebraska Statutes 46-1606
  • Breach: means partial removal of a dam creating a channel through the dam to the natural bed elevation of the stream. See Nebraska Statutes 46-1609
  • Dam: means any artificial barrier, including appurtenant works, with the ability to impound water, wastewater, or liquid-borne materials and which (a) is twenty-five feet or more in height from the natural bed of the stream or watercourse measured at the downstream toe of the barrier, or from the lowest elevation of the outside limit of the barrier if it is not across a stream channel or watercourse, to the maximum storage elevation or (b) has an impounding capacity at maximum storage elevation of fifty acre-feet or more, except that any barrier described in this subsection which is not in excess of six feet in height or which has an impounding capacity at maximum storage elevation of not greater than fifteen acre-feet shall be exempt, unless such barrier, due to its location or other physical characteristics, is classified as a high hazard potential dam. See Nebraska Statutes 46-1611
  • Department: means the Department of Natural Resources. See Nebraska Statutes 46-1613
  • Engineer: means a professional engineer licensed under the Engineers and Architects Regulation Act who (1) is competent in areas related to dam investigation, design, construction, and operation for the type of dam being investigated, designed, constructed, or operated, (2) has at least four years of relevant experience in investigation, design, construction, reconstruction, enlargement, alteration, breach, removal, or abandonment of dams, and (3) understands adverse consequences and dam failures. See Nebraska Statutes 46-1616
  • Owner: includes any of the following who or which owns, controls, manages, or proposes to construct, reconstruct, enlarge, alter, breach, remove, or abandon a dam:

    (1) The United States Government and its departments, agencies, and bureaus. See Nebraska Statutes 46-1625

  • Reconstruction: means partial or complete removal and replacement of an existing dam. See Nebraska Statutes 46-1629
  • Removal: means complete elimination of the dam embankment or structure to restore the approximate original topographic contours of the site. See Nebraska Statutes 46-1630

(2) The application shall give such pertinent information or data concerning the dam as may be required by the department.

(3) The application shall give the name and address of the applicant and shall adequately detail, with appropriate references to the existing dam, the proposed reconstruction, alteration, abandonment, breach, or removal of the dam. The application shall be accompanied by plans and specifications signed and sealed by the design engineer. The department may waive any of the requirements of this section if the requirements are unnecessary for the application approval.

(4) If an application is incomplete or defective, it shall be returned to the applicant to complete or to correct the defects. The application shall be corrected and returned to the department within ninety days after it is returned to the applicant or within such additional time as may be allowed by the department. If the application is returned to the department after expiration of such time period, it shall be dismissed.

(5) In case of an emergency in which the department declares that repairs or breaching of the dam are necessary to safeguard life and property, repairs or breaching shall be started immediately by the owner or by the department at the owner’s expense. The department shall be notified within twenty-four hours of emergency repairs or breaching when instituted by the owner.

(6) The proposed repairs or breaching shall conform to any orders issued by the department.