19 CFR 122.65 – Failure to depart
Current as of: 2024 | Check for updates
|
Other versions
Once an aircraft has been cleared or given permission to depart it must depart within 72 hours. The aircraft commander or agent shall report promptly to the port director if departure is delayed beyond or cancelled within 72 hours after the aircraft received clearance or permission to depart.
Terms Used In 19 CFR 122.65
- port director: means the person who has jurisdiction within the geographical boundaries of their port of entry unless the regulations provide that particular trade functions or determinations are exclusively within the purview of a Center Director or other CBP personnel. See 19 CFR 101.1
