23 CFR 650.809 – Movable span bridges
Current as of: 2024 | Check for updates
|
Other versions
A fixed bridge shall be selected wherever practicable. If there are social, economic, environmental or engineering reasons which favor the selection of a movable bridge, a cost benefit analysis to support the need for the movable bridge shall he prepared as a part of the preliminary plans.