All rates or charges collected by a permittee for services rendered by the permittee in the operation of the concession granted under a permit, must be submitted through the project engineer to the Secretary for approval. Copies of the approved rate schedule shall be posted in at least two conspicuous places on the premises. Approved rates may not be changed without first obtaining in the same manner a change in the rate schedule. The Secretary shall have the right to readjust rates charged from time to time and to amend or change any permit issued. Failure to comply with the approved rates automatically makes the permit subject to cancellation.

Terms Used In 25 CFR 173.11

  • Secretary: refers to the Secretary of the Interior; "project" to the Federal Indian irrigation project on which concession, lease or permit is granted, and "project engineer" to the engineer in charge of said project. See 25 CFR 173.1