43 CFR 3802.1 – Plan of operations
Current as of: 2024 | Check for updates
|
Other versions
An approved plan shall include appropriate environmental protection and reclamation measures selected by the authorized officer that shall be carried out by the operator. An operator may prepare and submit with a plan measures for the reclamation of the affected area.