46 CFR 160.077-7 – Procedure for approval of design or material revision
Current as of: 2024 | Check for updates
|
Other versions
(a) Each change in design, material, or construction of an approved PFD must be approved by the Commandant before being used in any production of PFDs.
(b) Determinations of equivalence of design, construction, and materials may be made only by the Commandant.