§ 15.501 Scope
§ 15.503 Definitions
§ 15.505 Cross reference
§ 15.507 Marketing of UWB equipment
§ 15.509 Technical requirements for ground penetrating radars and wall imaging systems
§ 15.510 Technical requirements for through-wall imaging systems
§ 15.511 Technical requirements for surveillance systems
§ 15.513 Technical requirements for medical imaging systems
§ 15.515 Technical requirements for vehicular radar systems
§ 15.517 Technical requirements for indoor UWB systems
§ 15.519 Technical requirements for hand held UWB systems
§ 15.521 Technical requirements applicable to all UWB devices
§ 15.523 Measurement procedures
§ 15.525 Coordination requirements

Terms Used In CFR > Title 47 > Chapter I > Subchapter A > Part 15 > Subpart F - Ultra-Wideband Operation

  • wall: is a concrete structure, the side of a bridge, the wall of a mine or another physical structure that is dense enough and thick enough to absorb the majority of the signal transmitted by the imaging system. See 47 CFR 15.503