(a) The project for flood control on the San Lorenzo River is adopted and authorized substantially in accordance with congressional approval and the final report of the Chief of Engineers dated June 30, 1994, as authorized by Section 101 (a) (5) of the Water Resources Development Act of 1996 (Public Law 104-303), as amended, at an estimated cost to the state of the sum that may be appropriated for state cooperation by statute, upon the recommendation and advice of the department.

(b) The City of Santa Cruz shall give assurances satisfactory to the Secretary of the Army that the local cooperation required by that final report will be furnished by the city in connection with the project for flood control.

Terms Used In California Water Code 12706.3

  • Appropriation: The provision of funds, through an annual appropriations act or a permanent law, for federal agencies to make payments out of the Treasury for specified purposes. The formal federal spending process consists of two sequential steps: authorization
  • Obligation: An order placed, contract awarded, service received, or similar transaction during a given period that will require payments during the same or a future period.
  • Public law: A public bill or joint resolution that has passed both chambers and been enacted into law. Public laws have general applicability nationwide.
  • State: means the State of California, unless applied to the different parts of the United States. See California Water Code 18
  • Statute: A law passed by a legislature.

(c) (1) The City of Santa Cruz, in conjunction with the Department of the Army, shall carry out the project referred to in subdivision (a) and may make modifications and amendments to the plans as may be necessary to carry out the plans for the purposes of Chapter 1 (commencing with Section 12750) and this chapter.

(2) Notwithstanding Section 12639, if there are any major modifications or amendments to the plans that result in a substantial increase in the costs to the state for any estimated cost for the project, no money shall be reallocated by the state in aid of that portion of the project until the revised plans have been reviewed and approved by the department. The department shall approve the revised plans if the department determines that the benefits of the proposed works of improvement for the revised project will exceed the cost thereof and that the revised project appears to be the most economical project plan, considering construction costs, land costs, easements and rights-of-way costs, and operation and maintenance costs.

(d) State funding for the project is contingent on the provision of funds for that purpose in either the annual Budget Act or a general obligation bond act. Reimbursement of the state share of the nonfederal costs of the project shall be for those project costs incurred on or after October 12, 1996, the date on which the project was authorized by Congress, as set forth in Section 101(a)(5) of the Water Resources Development Act of 1996 Public Law 104-303).

(e) State funding, available upon appropriation by the Legislature, may be used within the authorized project boundaries as set forth in the final report of the Chief of Engineers dated June 30, 1994, as authorized by Section 101(a)(5) of the Water Resources Development Act of 1996 (Public Law 104-303), as amended. The state, through the Flood Control Subventions Program, may fund construction of the final phase of the authorized project, as specified in the Army Corps of Engineers report entitled San Lorenzo River Stable Channel Design, March 27, 2015, when there are not available federal funds for project completion. The funding for project completion shall be 70 percent from the state and 30 percent from the local project sponsor, except that the state share shall not exceed the equivalent state share if there was federal project funding.

(Amended by Stats. 2017, Ch. 166, Sec. 1. (AB 436) Effective January 1, 2018.)