Preliminary design work, including a cost estimate for the project, shall be completed before a loan or grant is awarded. Operation and maintenance costs shall be the responsibility of the supplier and may not be considered as part of the project cost. Costs for planning and preliminary engineering studies may be reimbursed following the receipt of a loan or grant subject to approval by the department and the State Department of Health Services.

(Added by Stats. 1984, Ch. 378, Sec. 1. Approved in Proposition 28 at the November 6, 1984, election.)

Terms Used In California Water Code 13827

  • Department: means the Department of Water Resources. See California Water Code 13815
  • Project: means proposed facilities for the construction, improvement, or rehabilitation of the domestic water system, and may include water supply, treatment works, and all or part of a water distribution system, if necessary to carry out the purpose of this chapter. See California Water Code 13815
  • State: means the State of California, unless applied to the different parts of the United States. See California Water Code 18