Hawaii Revised Statutes 269-146 – Hawaii electricity reliability surcharge; authorization; cost recovery
Current as of: 2024 | Check for updates
|
Other versions
Terms Used In Hawaii Revised Statutes 269-146
- Appropriation: The provision of funds, through an annual appropriations act or a permanent law, for federal agencies to make payments out of the Treasury for specified purposes. The formal federal spending process consists of two sequential steps: authorization
- Commission: means the public utilities commission. See Hawaii Revised Statutes 269-141
- Contract: A legal written agreement that becomes binding when signed.
- Electric element: means any plant, line, cable, facility, control system, equipment, or other technology used for the generation, transmission, distribution, storage, regulation, or physical control of electricity. See Hawaii Revised Statutes 269-141
- Hawaii electric system: means all electric elements located within the State together with all interconnections located within the State that collectively provide for the generation, transmission, distribution, storage, regulation, or physical control of electricity over a geographic area; provided that this term shall not include any electric element operating without any interconnection to any other electric element located within the State. See Hawaii Revised Statutes 269-141
- Interconnection: means the physical contact point connecting an electric element to another electric element or group of electric elements that allows for the flow and transfer of electricity between electric elements. See Hawaii Revised Statutes 269-141