Illinois Compiled Statutes 30 ILCS 725/7.2 – Study Design
Current as of: 2024 | Check for updates
|
Other versions
The study authorized in Section 7.1 shall consider:
(a) Rate schedule design to encourage the use of solar energy systems, and to provide supplemental conventional energy at reasonable rates;
(b) Mechanisms that can be used to reduce the cost of supplemental energy supply to users of solar energy systems; and
(c) Criteria for the selection of power plant sites that consider the potential use of solar energy systems as a part of the load forecast projections in the services area of public energy suppliers.
(a) Rate schedule design to encourage the use of solar energy systems, and to provide supplemental conventional energy at reasonable rates;
(b) Mechanisms that can be used to reduce the cost of supplemental energy supply to users of solar energy systems; and
(c) Criteria for the selection of power plant sites that consider the potential use of solar energy systems as a part of the load forecast projections in the services area of public energy suppliers.