Sec. 15. In developing the plan, the commission shall determine the best method and manner of establishing flood control, giving consideration to the following:

(1) The reservoir method.

Terms Used In Indiana Code 14-30-2-15

(2) The channel improvement method.

(3) The levee method.

(4) Flood plain regulation.

(5) All nonstructural methods.

[Pre-1995 Recodification Citation: 36-7-6.1-14.]

As added by P.L.1-1995, SEC.23.