1.  After the planning commission or the governing body or its authorized representative has approved the tentative map or waived the requirement of its filing, or 60 days after the date of its filing, whichever is earlier, the person who proposes to divide the land may file a final map of the division with the governing body or its authorized representative or, if authorized by the governing body, with the planning commission. The map must be accompanied by a written statement signed by the treasurer of the county in which the land to be divided is located indicating that all property taxes on the land for the fiscal year have been paid.

Need help reviewing a real estate contract?
Have it reviewed by a lawyer, get answers to your questions and move forward with confidence.
Connect with a lawyer now

Terms Used In Nevada Revised Statutes 278.472

  • county: includes Carson City. See Nevada Revised Statutes 0.033
  • Fiscal year: The fiscal year is the accounting period for the government. For the federal government, this begins on October 1 and ends on September 30. The fiscal year is designated by the calendar year in which it ends; for example, fiscal year 2006 begins on October 1, 2005 and ends on September 30, 2006.
  • person: means a natural person, any form of business or social organization and any other nongovernmental legal entity including, but not limited to, a corporation, partnership, association, trust or unincorporated organization. See Nevada Revised Statutes 0.039

2.  This map must be:

(a) Entitled ‘Map of Division into Large Parcels.’

(b) Filed with the governing body or its authorized representative or, if authorized by the governing body, with the planning commission not later than 1 year after the date that the tentative map was first filed with the planning commission or the governing body or its authorized representative or that the requirement of its filing was waived.

(c) Prepared by a professional land surveyor.

(d) Based upon an actual survey by the preparer and show the date of the survey and contain the certificate of the surveyor required pursuant to NRS 278.375.

(e) Clearly and legibly drawn in permanent black ink upon good tracing cloth or produced by the use of other materials of a permanent nature generally used for this purpose in the engineering profession. Affidavits, certificates and acknowledgments must be legibly stamped or printed upon the map with permanent black ink.

(f) Twenty-four by 32 inches in size with a marginal line drawn completely around each sheet, leaving an entirely blank margin of 1 inch at the top, bottom, and right edges, and of 2 inches at the left edge along the 24-inch dimension.

(g) Of scale large enough to show clearly all details.

3.  The particular number of the sheet and the total number of sheets comprising the map must be stated on each of the sheets, and its relation to each adjoining sheet must be clearly shown.

4.  This map must show and define:

(a) All subdivision lots by the number and actual acreage of each lot.

(b) Any roads or easements of access which exist and which the owner intends to offer for dedication, any roads or easements of access which are shown on the applicable master plan and any roads or easements of access which are specially required by the planning commission or the governing body or its authorized representative.

(c) Except as otherwise provided in NRS 278.329, an easement for public utilities that provide gas, electric and telecommunications services and for any video service providers that are authorized pursuant to chapter 711 of NRS to operate a video service network in that area.

(d) Except as otherwise provided in NRS 278.329, an easement for public utilities that provide water and sewer services.

(e) Any existing easements for irrigation or drainage, and any normally continuously flowing watercourses.