The board shall hold meetings at such times and such places as it shall designate for the purpose of administering an examination to those persons desiring to become certified as water well contractors, water well pump and pitless unit installers, monitoring well contractors, or geothermal system drillers. The board shall give no less than ten days’ written notice to each applicant of the time and place of such examination. The board shall develop separate examinations for the certification of water well contractors, water well pump and pitless unit installers, monitoring well contractors, and geothermal system drillers.

Terms Used In North Dakota Code 43-35-12

  • written: include "typewriting" and "typewritten" and "printing" and "printed" except in the case of signatures and when the words are used by way of contrast to typewriting and printing. See North Dakota Code 1-01-37