After the approval of the engineering plan as provided by ORS § 552.418 and before beginning the construction of any works, the district board shall give notice, by publication and otherwise, as it may consider advisable, calling for bids for the construction of such works, or any portion thereof. [1969 c.606 § 36; 1989 c.182 § 48]

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Oregon Statutes 552.423

  • District: means a water improvement district proposed or created under this chapter. See Oregon Statutes 552.013
  • Engineering plan: means the plans and specifications for the works to be constructed including:

    (a) Maps, profiles, plans and other data necessary to show the location and character of the work, and the property benefited, taken or damaged;

    (b) All rights of way or other property which may be required for the construction of the works; and

    (c) Estimates of the cost of the works and of the benefits and damages which will accrue to each tract of land upon the construction of the works. See Oregon Statutes 552.013

  • Works: means dams, storage reservoirs, canals, ditches, dikes, levees, revetments, and all other structures, facilities, improvements and property necessary or convenient for draining land, controlling flood or surface waters, or supplying water for irrigation, domestic supply or other purposes. See Oregon Statutes 552.013

 

[Repealed by 1969 c.168 § 1]