(1) The Public Utility Commission shall establish minimum criteria that a cogeneration facility or small power production facility must meet to qualify as a qualifying facility under ORS § 543.610, 757.005 and 758.505 to 758.555.

(2) The terms and conditions for the purchase of energy or energy and capacity from a qualifying facility shall:

(a) Be established by rule by the commission if the purchase is by a public utility;

(b) Be adopted by an electric cooperative or people’s utility district according to the applicable provision of ORS Chapter 62 or 261; and

(c) Be established by a municipal utility according to the requirements of the municipality’s charter and ordinance.

(3) The rules or policies adopted under subsection (2) of this section also shall:

(a) Establish safety and operating requirements necessary to adequately protect all systems, facilities and equipment of the electric utility and qualifying facility;

(b) Be consistent with applicable standards required by the Public Utility Regulatory Policies Act of 1978 (P.L. 95-617); and

(c) Be made available to the public at the commission’s office. [1983 c.799 § 4]

 

[1979 c.730 § 6; repealed by 1981 c.714 § 13]