South Dakota Codified Laws 34A-2-119.1. Annual stormwater fees on construction and industrial sites
There is hereby imposed an annual stormwater fee on each construction and industrial site that is required to operate under a general water pollution control permit issued under chapter 34A-2. The annual fee imposed in § 34A-2-117 is as follows:
(1) The fee payable by the Department of Transportation is twenty-five thousand dollars per year. The fee accrues on August first of each year and is due on August thirty-first;
(2) The fee for a construction site that is required to operate under a general water pollution control permit for stormwater discharges associated with construction activities as defined under 40 C.F.R. part 126 as amended to January 1, 2018, and issued under chapter 34A-2, other than any site owned by the Department of Transportation, is based on the number of acres disturbed for the entire construction project and the fee table below:
Disturbed Area (Acres) |
Fee ($) |
Less than 5 |
100 |
5 to less than 40 |
250 |
40 to less than 80 |
500 |
80 or more |
750 |