(a) The department will receive proposals from local agencies, either city or county, for the construction of a connector. Proposals shall contain an agreement on the part of the local agency to participate in the amount of fifty percent (50%) of the cost of the project, and to maintain the connectors at its own expense after completion of the project. The department shall receive the proposals on the basis of coordinated development of access to the various sections of interstate highway routes or fully controlled access highways as they become open to traffic, and in accordance with established departmental criteria for priority of construction and in accordance with the availability of funds.

Terms Used In Tennessee Code 54-5-507

  • connector: means a roadway, or segment of a roadway, that will provide, or facilitate, appropriate ingress and egress, between an interstate highway or fully controlled access highway facility and a roadway that is of important benefit to a populous locality. See Tennessee Code 54-5-502
  • Department: means the department of transportation. See Tennessee Code 54-5-502
  • Highway: includes public bridges and may be held equivalent to the words "county way" "county road" or "state road". See Tennessee Code 1-3-105
  • Local agency: means any county or incorporated city or town in this state. See Tennessee Code 54-5-502
  • Project: includes all of the phases of work required to produce a completed connector, including location, design, acquisition of rights-of-way, relocation of utility facilities, the cost of which is not the legal obligation of the owners thereof, and the construction or reconstruction of the connector. See Tennessee Code 54-5-502
  • Road: includes public bridges and may be held equivalent to the words "county way" "county road" or "state road". See Tennessee Code 1-3-105
  • State: when applied to the different parts of the United States, includes the District of Columbia and the several territories of the United States. See Tennessee Code 1-3-105
  • written: includes printing, typewriting, engraving, lithography, and any other mode of representing words and letters. See Tennessee Code 1-3-105
(b) In no event shall the engineering phase of a connector project be begun by the department until the entire cost of the engineering, as estimated by the department, is deposited with the department by the local agency.
(c) After the engineering phase of the project has been completed, the right-of-way phase of the project shall not be begun by the department until fifty percent (50%) of the cost of the right-of-way phase of the project, as estimated by the department, is deposited with the department by the local agency.
(d)

(1) After the right-of-way phase of the project has been completed, the construction phase of the project shall not be begun by the department until fifty percent (50%) of the remaining cost of the project, as estimated by the department, is deposited with the department by the local agency.
(2) In arriving at the amount mentioned in subdivision (d)(1), the local agency shall receive a credit of fifty percent (50%) of the amount deposited by the local agency for the engineering phase.
(e) In the event the local agency does not deposit with the department fifty percent (50%) of the cost of the right-of-way phase of the project, as estimated by the department, within sixty (60) days after the completion by the department of the engineering for the project, or should the local agency not deposit with the department fifty percent (50%) of the cost of the construction phase of the project, as estimated by the department, within sixty (60) days after the completion by the department of the right-of-way phase of the project, the department may, at its option, terminate any agreement with the local agency with respect to the local connector, and any funds deposited with the department by the local agency for the engineering phase or the right-of-way phase, or both, shall become part of the general highway fund free from all claims by the local agency.
(f) In the event the local agency does not deposit with the department fifty percent (50%) of the cost of the construction phase of the project as provided for in subsection (d), and the department exercises its option to terminate any agreement with the local agency with respect to the project, the local agency shall pay to the department, upon written demand, the actual amount necessary to reimburse the department for expenditures made in accomplishing the engineering and right-of-way phases after deducting the amounts previously deposited by the local agency as the entire estimated cost of the engineering phase and as fifty percent (50%) of the estimated cost of the right-of-way phase.
(g) In the event of the failure of the local agency to fully comply with this section, the department shall be authorized to receive any funds, excluding rural roads and federal-aid secondary roads funds, that would otherwise be payable to the local agency for highway purposes from the state, until the department has recovered the amount necessary to result in the fifty percent (50%) financial participation in the actual total cost of any phase, or reimbursement in full, as provided for in subsection (a), (c) or (d).
(h) Following the completion of the project, the department shall determine the actual total cost of the project and either pay to or receive from the local agency an amount that results in the equal financial participation by the parties in the total cost of the project.
(i) It is the intent of this part for the local agency to participate in the cost of connector projects with road or street funds of the local agency that shall, in no event, include in any part funds from the rural roads program or the federal-aid secondary roads program.
(j) The maintenance of any road designated as a connector under this part shall be the responsibility of the local agency that participated in the cost of the project.