Terms Used In Tennessee Code 68-211-502

  • Construction: means the erection, building, acquisition, alteration, reconstruction, improvement, or extension of energy recovery and/or energy recovery facilities, the engineering, architectural designs, plans, working drawings, specifications, procedures, and other action necessary in the construction of such facilities, and the inspection and supervision of the construction of such facilities. See Tennessee Code 68-211-501
  • Energy recovery facility: means a facility for the recovery of energy or energy producing materials from the controlled processing of solid waste and the production of energy from such solid waste and other materials, including coal, for a heating and cooling system and/or for the production of electricity and process steam. See Tennessee Code 68-211-501
  • municipality: means any county, incorporated town or city, metropolitan government, or special district of this state, empowered to provide solid waste disposal services, or any not-for-profit corporation authorized by the laws of Tennessee to act for the benefit or on behalf of any one (1) or more of such local governments. See Tennessee Code 68-211-501
  • Resource recovery facility: means a facility for the systematic separation and recovery of recyclable materials from solid waste and a processing of solid waste, sewage sludge, and other solids for fuel mixtures or fuel supplements. See Tennessee Code 68-211-501
  • Solid waste: means garbage, refuse, including, without limitations, recyclable materials when they become discarded, and other discarded solid waste materials, including waste materials of a solid nature resulting from industrial, commercial, and agricultural operations, and from community activities. See Tennessee Code 68-211-501

A municipality has the power to construct, purchase, improve, operate and maintain within its corporate limits, or within the limits of the county wherein it is located, an energy recovery facility or facilities and/or resource recovery facility or facilities for the production of energy from the energy recovery facility for heating or cooling, and/or the production of electricity or process steam and/or the production of fuel mixtures or fuel supplements and recovery of recyclable materials from solid waste and the sale of the fuel supplements, and recyclable materials. The construction of the facility shall include all necessary land, rights-of-way, easements, buildings and all other appurtenances usual to such plants, as well as the building of all necessary means of transportation, including pipelines for energy or fuel supplements, including obtaining all necessary rights of way or easements necessary thereto.