Texas Water Code 16.232 – Location of Projects; Reports
Current as of: 2024 | Check for updates
|
Other versions
The executive director shall maintain files reflecting engineering reports, studies, drawings, and staff findings and recommendations pertaining to the location and effect of reclamation projects.
