A. As used in this section, unless the context requires a different meaning:

Terms Used In Virginia Code 15.2-2288.01

  • farm: means any person that obtains at least 51 percent of its annual gross income from agricultural operations and produces the agricultural waste used as feedstock for the waste-to-energy technology, (ii) "agricultural waste" means biomass waste materials capable of decomposition that are produced from the raising of plants and animals during agricultural operations, including animal manures, bedding, plant stalks, hulls, and vegetable matter, and (iii) "waste-to-energy technology" means any technology, including but not limited to a methane digester, that converts agricultural waste into gas, steam, or heat that is used to generate electricity on-site. See Virginia Code 1-222.1
  • Locality: means a county, city, or town as the context may require. See Virginia Code 1-221
  • Special exception: means a special use that is a use not permitted in a particular district except by a special use permit granted under the provisions of this chapter and any zoning ordinances adopted herewith. See Virginia Code 15.2-2201

“Biomass” means agricultural-related materials including vineyard, grain or crop residues; straws; aquatic plants; and crops and trees planted for energy production.

“Small-scale conversion of biomass” means the conversion of any renewable biomass into heat, power, or biofuels.

B. A zoning ordinance shall not require that a special exception or special use permit be obtained for the small-scale conversion of biomass if: (i) at least 50 percent of the feedstock is produced either on site or by the owner of the conversion equipment; (ii) any structure used for the processing of the feedstock into energy occupies less than 4,000 square feet, not including the space required for storage of feedstock; and (iii) the owner of the farm notifies the administrative head of the locality in which the processing occurs. Localities may adopt reasonable requirements for setback, minimum lot area, and restrictions on the hours of operation and maximum noise levels applicable to the small-scale conversion of biomass. No setback, lot area, hours of operation or noise requirements may be more restrictive than similar provisions for other agricultural structures or activities.

2009, c. 363.