If any consumer to whom a meter has been furnished shall request the commission in writing to inspect such meter, the commission shall have the same inspected and tested, and if the same, on being so tested, shall be found to be more than four percent if an electric meter, or more than two percent if a gas meter, or more than two percent if a water meter, defective or incorrect to the prejudice of the consumer, the expense of such inspection and test shall be borne by the gas company, electrical company or water company, and if the same, on being so tested shall be found to be correct within the limits of error prescribed by the provisions of this section, the expense of such inspection and test shall be borne by the consumer.
[ 1961 c 14 § 80.28.170. Prior: 1911 c 117 § 74, part; RRS § 10410, part.]

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In Washington Code 80.28.170

  • Commission: means the utilities and transportation commission. See Washington Code 80.04.010
  • Gas company: includes every corporation, company, association, joint stock association, partnership and person, their lessees, trustees or receiver appointed by any court whatsoever, and every city or town, owning, controlling, operating or managing any gas plant within this state. See Washington Code 80.04.010
  • Water company: includes every corporation, company, association, joint stock association, partnership and person, their lessees, trustees or receivers appointed by any court whatsoever, and every city or town owning, controlling, operating, or managing any water system for hire within this state. See Washington Code 80.04.010