Persons owning or desiring to improve contiguous tracts of tide marsh or swampy lands exposed to the overflow of the tide and capable of being made dry, may separate their respective tracts by a dike or ditch, which shall make and designate their common boundary. In all such cases said dike or ditch shall be constructed at the equal cost and expense of the respective parties, and either party failing to pay his or her contributive share of such expense shall be liable to the party constructing the dike or ditch for such contributive share, or so much thereof as may remain due and unpaid, to be recovered in a civil action in a court of competent jurisdiction and the party constructing such dike shall also be entitled to a lien upon the tract of the party failing to pay his or her contributive share for the construction of said dike, or so much thereof as shall be due, which lien shall be secured and enforced as liens of material suppliers and mechanics are now by law enforced.
[ 2007 c 218 § 95; Code 1881 § 2517; No RRS. Prior: 1877 p 258 § 1.]

NOTES:

IntentFinding2007 c 218: See note following RCW 41.08.020.

Ask a legal question, get an answer ASAP!
Click here to chat with a lawyer about your rights.

Terms Used In Washington Code 85.28.130

  • Jurisdiction: (1) The legal authority of a court to hear and decide a case. Concurrent jurisdiction exists when two courts have simultaneous responsibility for the same case. (2) The geographic area over which the court has authority to decide cases.
  • Lien: A claim against real or personal property in satisfaction of a debt.