The department is authorized to prepare and/or adopt a comprehensive water pollution control and abatement plan and to make subsequent amendments thereto, for each basin established pursuant to RCW 90.48.270. Comprehensive plans for sewage drainage basins may be prepared by any municipality and submitted to the department for adoption.

Terms Used In Washington Code 90.48.280

  • Amendment: A proposal to alter the text of a pending bill or other measure by striking out some of it, by inserting new language, or both. Before an amendment becomes part of the measure, thelegislature must agree to it.
  • person: may be construed to include the United States, this state, or any state or territory, or any public or private corporation or limited liability company, as well as an individual. See Washington Code 1.16.080
Prior to adopting a comprehensive plan for any basin or any subsequent amendment thereof the department shall hold a public hearing thereon. Notice of such hearing shall be given by registered mail, together with copies of the proposed plan, to each municipality, or other political subdivision, within the basin exercising a sewage disposal function, at least twenty days prior to the hearing date. Such hearing may be continued from time to time and, at the termination thereof, the department may reject the plan proposed or adopt it with such modifications as it shall deem proper.
Following adoption of a comprehensive plan for any basin, the department shall require compliance with such plan by any municipality or person operating or constructing a sewage collection, treatment or disposal system or plant, or any improvement to or extension of an existing sewage collection, treatment or disposal system or plant, within the basin.

NOTES:

PurposeShort titleConstructionRulesSeverabilityCaptions1987 c 109: See notes following RCW 43.21B.001.