|
|
§ 299.301 |
Restoration or renewal of track under traffic conditions |
§ 299.303 |
Measuring track not under load |
§ 299.305 |
Drainage |
§ 299.307 |
Vegetation |
§ 299.309 |
Classes of track: operating speed limits |
§ 299.311 |
Track geometry; general |
§ 299.313 |
Track geometry; performance based |
§ 299.315 |
Curves; elevation and speed limitations |
§ 299.317 |
Track strength |
§ 299.319 |
Track fixation and support |
§ 299.321 |
Defective rails |
§ 299.323 |
Continuous welded rail (CWR) plan |
§ 299.325 |
Continuous welded rail (CWR); general |
§ 299.327 |
Rail end mismatch |
§ 299.329 |
Rail joints and torch cut rails |
§ 299.331 |
Turnouts and crossings generally |
§ 299.333 |
Frog guard rails and guard faces; gauge |
§ 299.335 |
Derails |
§ 299.337 |
Automated vehicle-based inspection systems |
§ 299.339 |
Daily sweeper inspection |
§ 299.341 |
Inspection of rail in service |
§ 299.343 |
Initial inspection of new rail and welds |
§ 299.345 |
Visual inspections; right of way |
§ 299.347 |
Special inspections |
§ 299.349 |
Inspection records |
§ 299.351 |
Qualifications for track maintenance and inspection personnel |
§ 299.353 |
Personnel qualified to supervise track restoration and renewal |
§ 299.355 |
Personnel qualified to inspect track |
§ 299.357 |
Personnel qualified to inspect and restore continuous welded rail |