Iowa Code 476.45 – Exemption from excess capacity
Current as of: 2023 | Check for updates
|
Other versions
Capacity of an alternate energy production facility or small hydro facility, that is owned or purchased by an electric utility, shall not be included in a calculation of an electric utility’s excess generating capacity for ratemaking purposes.