49 CFR 213.367 – Special inspections
Current as of: 2024 | Check for updates
|
Other versions
In the event of fire, flood, severe storm, temperature extremes or other occurrence which might have damaged track structure, a special inspection shall be made of the track involved as soon as possible after the occurrence and, if possible, before the operation of any train over that track.