(a)

Ask a business law question, get an answer ASAP!
Thousands of highly rated, verified business lawyers.
Click here to chat with a lawyer about your rights.

Terms Used In Tennessee Code 59-8-113

  • Commissioner: means the commissioner of environment and conservation or the commissioner's designee. See Tennessee Code 59-8-102
  • Permit: means a permit to conduct surface coal mining and reclamation operations issued by the commissioner. See Tennessee Code 59-8-102
  • Permittee: means a person holding, or required by this part or rules promulgated by the commissioner to hold, a permit. See Tennessee Code 59-8-102
  • Reclamation plan: means a plan submitted by an applicant for a permit under §. See Tennessee Code 59-8-102
  • written: includes printing, typewriting, engraving, lithography, and any other mode of representing words and letters. See Tennessee Code 1-3-105
(1) During the term of the permit, the permittee may submit to the commissioner an application for a revision of the permit, together with a revised reclamation plan. The commissioner may also require the revision of a permit or a mining or reclamation plan if the present plan is inadequate to protect the public and the environment consistent with this part subject to the requirements of subdivision (a)(2).
(2) The commissioner shall not approve an application for a revision of a permit unless the commissioner finds that the revision meets all the standards of this part and the commissioner’s rules including that reclamation as required by the Surface Mining Control and Reclamation Act of 1977 (30 U.S.C. § 1201 et seq.) and this part can be accomplished under the revised reclamation plan. The revision shall be approved or disapproved within a period of time established by the commissioner. The commissioner shall establish guidelines for a determination of the scale or extent of a revision request for which all permit application information requirements and procedures, including notice and hearings, apply. Any revisions that propose significant alterations in the reclamation plan shall, at a minimum, be subject to notice and hearing requirements.
(3) Any extensions to the area covered by the permit except incidental boundary revisions must be made by application for another permit.
(b) No transfer, assignment, or sale of the rights granted under any permit issued pursuant to this part shall be made without the commissioner’s written approval.
(c) In addition to any other review required by federal law or regulations, the commissioner shall, within a time limit prescribed in rules promulgated by the commissioner, review outstanding surface coal mining and reclamation operation permits. The commissioner may require reasonable revision or modification of the permit provisions during the term of the permit; provided, that the revision or modification is based upon a written finding and subject to notice and hearing requirements established by the commissioner.