46 CFR 160.076-17 – Approval of design or material changes
Current as of: 2024 | Check for updates
|
Other versions
(a) The manufacturer must submit any proposed changes in design, material, or construction to the recognized laboratory and the Commandant for approval before changing PFD production methods.
(b) Determinations of equivalence of design, construction, and materials may be made only by the Commandant or a designated representative.