48 CFR 47.306-3 – Adequacy of loading and unloading facilities
Current as of: 2024 | Check for updates
|
Other versions
(a) When determining the transportation capabilities of an offeror, the contracting officer shall consider the type and adequacy of the offeror’s shipping facilities, including the ability to consolidate and ship in carload or truckload lots.
(b) The contracting officer shall consider the type and adequacy of the consignee’s receiving facilities to avoid shipping schedules that cannot be properly accommodated.