(a) In general

Not later than 1 year after June 10, 2014, and biennially thereafter, the Secretary shall conduct a study to determine the feasibility of—

(1) carrying out projects for the inland and intracoastal waterways for purposes of—

(A) flood damage reduction;

(B) emergency streambank and shoreline protection; and

(C) prevention and mitigation of shore damages attributable to navigation improvements; and


(2) modifying projects for the inland and intracoastal waterways for the purpose of improving the quality of the environment.

(b) Recommendations

Terms Used In 33 USC 2255

  • Damages: Money paid by defendants to successful plaintiffs in civil cases to compensate the plaintiffs for their injuries.

In conducting the study, the Secretary shall develop specific project recommendations and prioritize those recommendations based on—

(1) the extent of damage and land loss resulting from riverbank erosion;

(2) the rate of erosion;

(3) the significant threat of future flood risk to public property, public infrastructure, or public safety;

(4) the destruction of natural resources or habitats; and

(5) the potential cost savings for maintenance of the channel.

(c) Disposition

The Secretary may carry out any project identified in the study conducted pursuant to subsection (a) in accordance with the criteria for projects carried out under one of the following authorities:

(1) Section 701r of this title.

(2) Section 701s of this title.

(3) Section 426i of this title.

(4) Section 2309a of this title.

(d) Annual report

For a project recommended pursuant to the study that cannot be carried out under any of the authorities specified in subsection (c), upon a determination by the Secretary of the feasibility of the project, the Secretary may include a recommendation concerning the project in the annual report submitted to Congress under section 2282d of this title.