(a) Establishment of life cycle cost methods and procedures

The Secretary, in consultation with the Director of the Office of Management and Budget, the Secretary of Defense, the Director of the National Institute of Standards and Technology, and the Administrator of the General Services Administration, shall—

(1) establish practical and effective present value methods for estimating and comparing life cycle costs for Federal buildings, using the sum of all capital and operating expenses associated with the energy system of the building involved over the expected life of such system or during a period of 40 years, whichever is shorter, and using average fuel costs and a discount rate determined by the Secretary; and

(2) develop and prescribe the procedures to be followed in applying and implementing the methods so established.

(b) Use of life cycle cost methods and procedures

Terms Used In 42 USC 8254

  • Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC

(1) The design of new Federal buildings, and the application of energy conservation measures to existing Federal buildings, shall be made using life cycle cost methods and procedures established under subsection (a).

(2) In leasing buildings for its own use or that of another agency, each agency shall, after January 1, 1994, fully consider the efficiency of all potential building space at the time of renewing or entering into a new lease.

(c) Use in non-Federal structures

The Secretary shall make available information to the public on the use of life cycle cost methods in the construction of buildings, structures, and facilities in all segments of the economy.