A. The commissioner shall examine any subdivision offered for sale or lease and shall make public his findings. The total cost of travel and subsistence expenses incurred by the department in the examination, in addition to the initial filing fee provided for in this section, shall be borne by the subdivider on the basis of actual cost to the department. A filing fee of five hundred dollars or such lesser fee as determined by the commissioner shall accompany the written notification required in section 32-2181. The commissioner may allow the developer to outsource and pay for the cost of physical inspections so long as the department approves the inspector and the inspection for content.

Terms Used In Arizona Laws 32-2182

  • Commissioner: means the state real estate commissioner. See Arizona Laws 32-2101
  • Complaint: A written statement by the plaintiff stating the wrongs allegedly committed by the defendant.
  • Department: means the state real estate department. See Arizona Laws 32-2101
  • including: means not limited to and is not a term of exclusion. See Arizona Laws 1-215
  • lease: includes every disposition, transfer, option or offer or attempt to dispose of or transfer real property, or an interest, use or estate in the real property, including offering the property as a prize or gift if a monetary charge or consideration for whatever purpose is required. See Arizona Laws 32-2101
  • Lease: A contract transferring the use of property or occupancy of land, space, structures, or equipment in consideration of a payment (e.g., rent). Source: OCC

B. The commissioner may, but is not required to, inspect a subdivision site if all of the following apply:

1. The commissioner has previously inspected the subdivision within the past two years.

2. All proposed improvements were complete at the time of the previous inspection.

3. The sales offering does not include any changes to the physical aspects of the subdivision, including the plat, site and locations of improvements.

C. The commissioner is not required to complete the inspection of the subdivision site before issuing a public report. Nevertheless, if the commissioner discovers anything during any subsequent inspection that would have been grounds to deny issuance of the public report or anything that would have warranted additional disclosure in the public report, the commissioner may issue a summary order as provided in section 32-2157.

D. Notwithstanding any other law, the commissioner has no more than five years after the date of an initial complaint or initiation of an investigation by the commissioner to determine if the sale or lease violated this article.