Illinois Compiled Statutes 735 ILCS 30/25-7-103.77 – Quick-take; City of Marion
Current as of: 2024 | Check for updates
|
Other versions
Quick-take proceedings under Article 20 may be used for a period of 18 months after July 30, 1999, by the City of Marion for the acquisition of property and temporary construction easements bounded by the following lines for improvement of the Pentecost Road project:
A variable width strip of land lying parallel with and
A variable width strip of land lying parallel with and
contiguous to the existing east and west Right-of-Way lines of Pentecost Road in the following quarter-quarter section:
|
the NW1/4 NW1/4, Section 16; NE1/4 NE1/4, Section 17;
NW1/4 SW1/4, Section 16; SW1/4 SW1/4, Section 16; NE1/4 SE1/4, Section 17; and the SE1/4 SE1/4, Section 17, all located in Township 9 South, Range 2 East of the Third Principal Meridian; Williamson County, Illinois.
|