Sec. 9. (a) A generator that ships solid waste to a waste-to-energy facility must, before the facility accepts the solid waste, notify the facility if the solid waste meets any of the following criteria:

(1) The solid waste contains:

(A) a volatile:

(i) liquid; or

(ii) solid;

(B) a powder;

(C) a flammable material;

(D) an allergen; or

(E) a sensitizer.

(2) The solid waste:

(A) was segregated from other solid waste; or

(B) received special preparation for shipment.

(3) The solid waste is a bulk material.

(4) The solid waste is a waste resulting directly from a manufacturing process.

     (b) The notification under subsection (a) is required before each shipment by a generator of solid waste in bulk quantities to a waste-to-energy facility.

As added by P.L.218-2001, SEC.8.